NCR - Eastern Peripheral Expressway

Total Cost
₹#####
From ### to ###
### Miiles long
Status
Completed

The 6 lane Eastern Peripheral Expressway (EPE) was built in a record of 500 days against a targeted 910 days. The Expressway connects Kundli to Palwal via Ghaziabad. A solar powered, greenfield expressway, EPE not only decongests Delhi and reduce vehicular pollution by 27%, but is also a green, smart, safe and efficient drive for lakhs of commuters travelling from/to/through National Capital Region (NCR). A fully access controlled engineering marvel, with cement concrete roads, a 120 km/hr speed limit, world class toll plazas, fountains, replica of monuments, 2.5 lakh median plantations, drip irrigation system, major bridges and more, EPE is a new expressway experience for India. EPE has been dedicated to the Nation by the Hon. Prime Minister on 27th May 2018.

Maple Infrastructure Trust (formerly known as Indian Highway Concessions Trust), participated in the Bid process for the Toll Operate Transfer (TOT) Bundle 7 bid and secured this Concession for a 20 year period. NCR Eastern Peripheral Expressway Private Limited (NCREPE) is the SPV formed

for managing this asset and Maple Highways platform will bring in best-in-class systems, processes and state of the art in asset management to this asset, to remain true to the DNA of this marquee project. A long term tie up with France based Egis Roads O&M is just one of many efforts towards this.



Due to the unique positioning of this asset as a peripheral road skirting the NCR, this link serves as evacuation route to several Industrial and Infrastructure activities like IT/ ITES, Electronics, Agro-based, Cement & Ceramic Industries in the East, Textiles, Automobile & Ancillary Manufacturing, Agro-Processing etc along the west, etc. In addition, NCR region along with satellite cities is home to about 40Mn residents, who use the asset as a quicker exit route rather than navigating congested streets of the NCR region. EPE is also slated to be the major exit artery for proposed Jewar Airport at Noida and towards this additional interchanges are being constructed on the asset.

The 6 lane Eastern Peripheral Expressway (EPE) was built in a record of 500 days against a targeted 910 days. The Expressway connects Kundli to Palwal via Ghaziabad. A solar powered, greenfield expressway, EPE not only decongests Delhi and reduce vehicular pollution by 27%, but is also a green, smart, safe and efficient drive for lakhs of commuters travelling from/to/through National Capital Region (NCR). A fully access controlled engineering marvel, with cement concrete roads, a 120 km/hr speed limit, world class toll plazas, fountains, replica of monuments, 2.5 lakh median plantations, drip irrigation system, major bridges and more, EPE is a new expressway experience for India. EPE has been dedicated to the Nation by the Hon. Prime Minister on 27th May 2018.

Indian Highway Concessions Trust, IHCT, participated in the Bid process for the Toll Operate Transfer (TOT) Bundle 7 bid and secured this Concession for a 20 year period. NCR Eastern Peripheral Expressway Private Limited (NCREPE) is the SPV formed for managing this asset and Maple Highways platform will bring in best-in-class systems, processes and state of the art in asset management to this asset, to remain true to the DNA of this marquee project. A long term tie up with France based Egis Roads O&M is just one of many efforts towards this.



Due to the unique positioning of this asset as a peripheral road skirting the NCR, this link serves as evacuation route to several Industrial and Infrastructure activities like IT/ ITES, Electronics, Agro-based, Cement & Ceramic Industries in the East, Textiles, Automobile & Ancillary Manufacturing, Agro-Processing etc along the west, etc. In addition, NCR region along with satellite cities is home to about 40Mn residents, who use the asset as a quicker exit route rather than navigating congested streets of the NCR region. EPE is also slated to be the major exit artery for proposed Jewar Airport at Noida and towards this additional interchanges are being constructed on the asset.

Orange Circle
Solar
Powered
135
length (KM)
Orange Circle
Fully Access Controlled
6
lane configuration
Orange Circle
Greenfield Expressway
810
Lane km
Orange Circle
World Class Toll Plazas
CarOrange CircleOrange CircleOrange CircleOrange Circle

Asset Features

Asset Features

Asset Features
Length (KM)
111.4
Lane Configuration
6 lane
Lane KM
668.4
Start and End Chainage
Km 17+600 to Km 129+000
Pavement Type
Flexible
Service Road (SR) Length
88.77
Slip Road Length
Flyovers
1
Interchanges
2
Major Bridges
6
Minor Bridges
17
Rail Over Bridge
3
Rail Under Bridge
-
Bypass
-
Pipe Culvert
62
Box Culvert/Slab Culvert
83
Vehicular Underpass
15
Other Underpass
9
Major Intersections /Junctions
-
Minor Junctions
226
Safety & Signage
Wire Rope Crash Barrier
Nil
W-Beam Crash Barrier
540 KM
Streetlight at Toll Plaza
Yes
High Mast at Toll Plaza
Yes
Low Mast Lights
Nil
Pedestrain Guard Rails
Yes
Solar Blinkers
Highway Streetlights
Highway High Mast Lights
Overhead Gantry Sign Boards
Cantilever Sign Boards
Others
Rain Water Harvesting
-
Solar Power Plants
Drain length-Lined
19.48
Drain length-Unlined
18.735
Median Plantation
87.544
Avenue Plantation
Independent Engineer
Yes
Key Dates
LOA Date
31.03.2022
CA Sign
06.05.2022
Appointed Date
Concession Period
20 Years
Concession End
Toll Plaza & ATMS
Toll Plaza
2
Tolling Length
111.4
Toll Lanes
30
ETC enabled lanes
28
Weigh in Motion Facility
26
Static Weigh Bridge
4
Tunnel or Elevated Walkway between Toll Lanes
Tunnel
ATMS/HTMS (Yes/No)
Road Side Assistance (Phone)
-
Video Surveillance System
-
Variable Message Sign
4
Automatic Traffic Counter
26
Metrological Data System
-
ATMS/HTMS Control Room
ETC Share of Revenue
98%+ ETC penetration
User Facilities
Parking cum Toilet Block
Truck Lay Bye
6
Bus Bays
56
Ambulance
2 Nos
Route Patrol Vehicle
2 Nos
Crane
2 Nos
Rest Area
-
Asset Features
Length (KM)
80 KM
Lane Configuration
4
Lane KM
320.4
Start and End Chainage
Km 405+000 to Km 485+000
Pavement Type
Flexible
Service Road (SR) Length
24.14
Slip Road Length
-
Flyovers
-
Interchanges
-
Major Bridges
4
Minor Bridges
13
Rail Over Bridge
-
Rail Under Bridge
-
Bypass
-
Pipe Culvert
58
Box Culvert/Slab Culvert
55
Vehicular Underpass
8
Other Underpass
3
Major Intersections /Junctions
5
Minor Junctions
76
Safety & Signage
Wire Rope Crash Barrier
Nil
W-Beam Crash Barrier
Nil
Streetlight at Toll Plaza
57.809 Km
High Mast at Toll Plaza
4 Nos
Low Mast Lights
10 Nos
Pedestrain Guard Rails
11.270 Km
Solar Blinkers
34 Nos
Highway Streetlights
23 Km
Highway High Mast Lights
11 Nos
Overhead Gantry Sign Boards
5 Nos
Cantilever Sign Boards
14 Nos
User Facilities
Parking cum Toilet Block
-
Truck Lay Bye
2
Bus Bays
18
Ambulance
1
Route Patrol Vehicle
2
Crane
1
Rest Area
-
Others
Rain Water Harvesting
-
Solar Power Plants
-
Drain length-Lined
22.08
Drain length-Unlined
-
Median Plantation
47.85
Avenue Plantation
-
Independent Engineer
Yes
Key Dates
LOA Date
29.04.2010
CA Sign
06.08.2010
Appointed Date
14.12.2011
Concession Period
26 Years
Concession End
13.12.2037
Toll Plaza & ATMS
Toll Plaza
1
Tolling Length
72.1
Toll Lanes
8
ETC enabled lanes
8
Weigh in Motion Facility
8
Static Weigh Bridge
2
Tunnel or Elevated Walkway between Toll Lanes
No
ATMS/HTMS (Yes/No)
No
Road Side Assistance (Phone)
-
Video Surveillance System
-
Variable Message Sign
-
Automatic Traffic Counter
8
Metrological Data System
-
ATMS/HTMS Control Room
-
ETC Share of Revenue
98%+ ETC penetration
Asset Features
Length (KM)
82.6 KM
Lane Configuration
4
Lane KM
330.4
Start and End Chainage
Km 322+400 to Km 405+000
Pavement Type
Flexible
Service Road (SR) Length
20.16
Slip Road Length
-
Flyovers
3
Interchanges
-
Major Bridges
1
Minor Bridges
11
Rail Over Bridge
-
Rail Under Bridge
-
Bypass
-
Pipe Culvert
52
Box Culvert/Slab Culvert
43
Vehicular Underpass
6
Other Underpass
5
Major Intersections /Junctions
5
Minor Junctions
70
Safety & Signage
Wire Rope Crash Barrier
Nil
W-Beam Crash Barrier
Nil
Streetlight at Toll Plaza
57.809 Km
High Mast at Toll Plaza
4 Nos
Low Mast Lights
10 Nos
Pedestrain Guard Rails
11.270 Km
Solar Blinkers
34 Nos
Highway Streetlights
23 Km
Highway High Mast Lights
11 Nos
Overhead Gantry Sign Boards
5 Nos
Cantilever Sign Boards
14 Nos
User Facilities
Parking cum Toilet Block
-
Truck Lay Bye
2
Bus Bays
22
Ambulance
2
Route Patrol Vehicle
2
Crane
1
Rest Area
-
Others
Rain Water Harvesting
-
Solar Power Plants
-
Drain length-Lined
14
Drain length-Unlined
-
Median Plantation
73.76 KM
Avenue Plantation
-
Independent Engineer
Yes
Key Dates
LOA Date
29.04.2010
CA Sign
06.08.2010
Appointed Date
14.12.2011
Concession Period
26 Years
Concession End
13.12.2037
Toll Plaza & ATMS
Toll Plaza
1
Tolling Length
82.6
Toll Lanes
8
ETC enabled lanes
8
Weigh in Motion Facility
6
Static Weigh Bridge
2
Tunnel or Elevated Walkway between Toll Lanes
No
ATMS/HTMS (Yes/No)
No
Road Side Assistance (Phone)
-
Video Surveillance System
-
Variable Message Sign
-
Automatic Traffic Counter
-
Metrological Data System
-
ATMS/HTMS Control Room
-
ETC Share of Revenue
98%+ ETC penetration
Asset Features
Length (KM)
79.36
Lane Configuration
6 lane
Lane KM
476.16
Start and End Chainage
Km 433+000 to Km 515
Pavement Type
Rigid cum Flexible
Service Road (SR) Length
142.73 km
Slip Road Length
Flyovers
-
Interchanges
10
Major Bridges
3
Minor Bridges
7
Rail Over Bridge
1
Rail Under Bridge
-
Bypass
-
Pipe Culvert
151
Box Culvert/Slab Culvert
76
Vehicular Underpass
17
Other Underpass
38
Major Intersections /Junctions
-
Minor Junctions
-
Safety & Signage
Wire Rope Crash Barrier
Nil
W-Beam Crash Barrier
Nil
Streetlight at Toll Plaza
57.809 Km
High Mast at Toll Plaza
4 Nos
Low Mast Lights
10 Nos
Pedestrain Guard Rails
11.270 Km
Solar Blinkers
34 Nos
Highway Streetlights
23 Km
Highway High Mast Lights
11 Nos
Overhead Gantry Sign Boards
5 Nos
Cantilever Sign Boards
14 Nos
Others
Rain Water Harvesting
-
Solar Power Plants
-
Drain length-Lined
44.97
Drain length-Unlined
45.352
Median Plantation
62.19
Avenue Plantation
Independent Engineer
Yes
Key Dates
LOA Date
29.04.2010
CA Sign
06.08.2010
Appointed Date
14.12.2011
Concession Period
26 Years
Concession End
13.12.2037
Toll Plaza & ATMS
Toll Plaza
1
Tolling Length
79.36
Toll Lanes
10
ETC enabled lanes
10
Weigh in Motion Facility
10
Static Weigh Bridge
2
Tunnel or Elevated Walkway between Toll Lanes
No
ATMS/HTMS (Yes/No)
Yes
Road Side Assistance (Phone)
40
Video Surveillance System
3
Variable Message Sign
4
Automatic Traffic Counter
10
Metrological Data System
ATMS/HTMS Control Room
1
ETC Share of Revenue
98%+ ETC penetration
User Facilities
Parking cum Toilet Block
Truck Lay Bye
2
Bus Bays
-
Ambulance
1 Nos
Route Patrol Vehicle
2 Nos
Crane
2 Nos
Rest Area
-

Photo Gallery

Photo Gallery

Latest Photos

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros

Latest Photos

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros